
Heat Pump & Mini-Split Electrician in Portland, OR & the Metro Area
- Circuit sized to the unit
- Works with your HVAC installer's schedule
- Plain-English explanations
What Our Customers Say
Is Your Portland Panel Ready for a Heat Pump?
Signs to call a heat pump electrician before install day
What a Heat Pump Electrician Does in Portland
Your HVAC contractor sets the equipment. As your heat pump electrician, we run the circuit it needs, mount the outdoor disconnect and make the final connection, across Portland, Beaverton, Gresham, and surrounding communities.
A heat pump is an electrical appliance first. The outdoor unit runs on a dedicated 240-volt circuit sized to the equipment nameplate — the maximum overcurrent protection and minimum circuit ampacity printed on the unit, not a guess — and the indoor air handler usually needs its own circuit too. A disconnect goes within sight of the outdoor unit, so whoever services it can cut the power without going inside. The HVAC contractor sets and charges the equipment; the heat pump electrician runs the circuits, mounts the disconnect and makes the final connection.
A ductless mini-split follows the same rules on a smaller scale: one circuit per outdoor unit, a disconnect beside it, and the indoor heads wired the way the manufacturer's instructions call for. Mini-splits are a common answer for a room the furnace never reached — a finished attic, a converted garage, a room over the garage. A second or third outdoor unit later means another circuit each time, so it pays to ask the panel question before the first one goes in.
That panel question is the first thing a heat pump electrician should settle. A heat pump replacing a gas furnace adds a large 240-volt load to a panel that was never sized for it, and in Portland houses built 1960 to 1989 with 100-amp services, and older houses with less, that calls for a load calculation. We add up what the house already runs plus the new equipment and tell you whether the panel carries it or needs work first. We pull the electrical permit for the new circuit.
Dedicated Circuit vs Panel Upgrade Plus Circuit
Dedicated Circuit
Panel Upgrade Plus Circuit
How Hiring a Heat Pump Electrician Works
Nameplate and panel
Equipment ratings read, home loads added up
Written estimate
Circuit alone or panel work first, in writing
Match the HVAC date
Timed with the equipment install
Run the circuit
240-volt feed, outdoor disconnect, final connection
Power it up
Circuit tested before the unit runs
What Affects the Cost of Heat Pump Wiring in Portland
The circuit is sized to the equipment, so the nameplate and your panel decide most of the job.
Equipment nameplate
The unit's rating sets the breaker and wire size, and larger equipment needs heavier wire.
The indoor air handler
Most systems need a second circuit for the air handler on top of the one for the outdoor unit.
How many outdoor units
Each mini-split outdoor unit gets its own circuit and disconnect, so a second or third adds up.
Distance to the outdoor unit
A unit on the far side of the house from the panel needs a longer run and more material.
Panel capacity
Replacing a gas furnace adds a big 240-volt load, and if the load calculation does not fit, panel work comes first.
Baseboards coming out
Removing electric baseboard heaters can free up panel space for the new circuit.
Inspection
Each new circuit is inspected, and we pull the electrical permit for it.
Every job gets a written estimate before any work starts.
Why Portland Homeowners Call PWR Pro Electric
Sized to the nameplate
Circuit and breaker match the equipment, not a guess
Panel checked first
You know before the equipment is on the pad
Financing available
Ask when you get your written estimate
Bonded & insured
Licensed Oregon contractor, CCB #259813
Heat Pump Electrician Questions
My house has electric baseboard heat. What changes in the wiring for a heat pump?
Is there a rebate for a heat pump?
How long does it take to wire a heat pump?
Can you wire a mini-split for just one room?
Where We Work
Book a Heat Pump Electrician in Portland
Written estimate before any work begins.
