503-984-1097Open until 9 pm · Open Sundays
PWR Pro Electric
A wall opened up mid-job, with dozens of circuit wires pulled out between the studs.

Kitchen & Bathroom Remodel Wiring in Portland, OR & the Metro Area

  • We coordinate with your contractor
  • GFCI and AFCI where code requires
  • No pressure to buy extras
Same day
Service available
About a day
Each new circuit
One day
Recessed lights, one room
CCB #259813
Oregon license

What Our Customers Say

Igor worked with my husband on several items on our home for sale. He did an exceptional job, very reliable and even found things we didn’t notice and fixed those. An amazing electrician, I highly recommend his services to anyone looking for an ace electrician!!
Carla A.
Repairs before a home sale
Igor is amazing to work with. His attention to detail and drive to get the project done to spec (as well as make it look good) are great attributes. He continually went above and beyond to make sure the project was completed to code. I will absolutely work with Igor again when any electrical needs arise.
Stephen C.
Project finished to code
If you’re looking for an electrician who is licensed, reliable, and reasonably priced, call Igor! I’ve worked with him for years in the real estate world, and he’s professional and has many years local experience. Great communication and always ready to help!
Olesya S.
Real estate work

Planning a Kitchen or Bathroom Remodel in Portland?

Signs it's time to bring in a remodel electrician

A new range, cooktop, oven or dishwasher is planned
The sink, island or appliances are moving
New counters need outlets along the backsplash
You want recessed, pendant or under-cabinet lights
The bathroom has no fan, or a noisy one
Walls or ceilings are coming open anyway

What a Remodel Electrician Does in a Portland Kitchen or Bath

A remodel electrician hired by you — circuits, outlets, lights and fans wired while the walls are open, on your contractor's schedule, across Portland, Lake Oswego, Tigard, and surrounding communities.

A remodel is the easiest time to change a home's wiring, because the walls are open. A remodel electrician plans the electrical side with you before demolition ends — circuits, outlets, lights, switches, the bath fan — then wires it at rough-in and fits devices and fixtures at finish.

In a kitchen, the large appliances usually each get their own circuit, depending on what you choose. Counter and island outlets get GFCI protection. Lighting tends to come in layers — recessed for the room, pendants over the island, under-cabinet for the counters — each on its own switch or dimmer.

A bathroom is smaller but stricter. Every outlet gets GFCI protection, the exhaust fan gets its own switch or a timer, and a light over the tub or shower needs a damp or wet rating. A heated floor needs its circuit before the tile goes down. In a Portland house built before 1940, an open bathroom wall can turn up original wiring; we tell you what we find while it's still open.

We work to your contractor's schedule: rough-in after framing and plumbing, the electrical inspection before insulation and drywall, finish after cabinets, counters and tile. We pull the permit. If the panel has no room for the new circuits, we tell you at the first visit, so a subpanel or a panel upgrade doesn't hold up the job.

Kitchen vs Bathroom Remodel Wiring

Kitchen Remodel

New circuits
Range, oven, dishwasher, disposal, microwave, fridge
Outlets
Counter and island, GFCI-protected
Lighting
Recessed, pendant and under-cabinet

Bathroom Remodel

New circuits
Outlets, exhaust fan, any heated floor
Outlets
GFCI protection on every one
Lighting
Vanity lights; damp- or wet-rated over the shower

How It Works Alongside Your Contractor

1

Plan the layout

Circuits, outlets, lights and switches marked with you

2

Written estimate

Agreed before the walls close

3

Rough-in wiring

Cable and boxes in after framing and plumbing

4

Open-wall inspection

Checked before insulation and drywall

5

Finish visit

Devices and fixtures in after cabinets and tile

What Affects the Cost of Remodel Wiring in Portland

The electrical side of a remodel grows with the plan, and these are the parts of the plan that move it most.

  • Appliance circuits

    Each large appliance you choose, such as a range, oven, dishwasher or microwave, usually gets its own circuit.

  • Lighting layers

    Recessed, pendant and under-cabinet lights each add fixtures, cable and a switch or dimmer.

  • Kitchen or bathroom

    A kitchen usually needs more new circuits than a bath, while a bath has stricter rules for wet areas.

  • Heated floor and fan

    A heated floor needs its own circuit before the tile goes down, and the exhaust fan gets its own switch or timer.

  • What the open walls turn up

    Original wiring found in a pre-1940 wall may need work while the studs are still bare.

  • Panel space

    If the panel has no room for the new circuits, a subpanel or panel upgrade joins the job.

  • Changes after drywall

    Moving an outlet or switch once walls are closed means cutting and patching, so early decisions keep the job smaller.

Every job gets a written estimate before any work starts.

Why Homeowners Hire Us as Their Remodel Electrician

Hired by you, timed to your contractor

Booked around their work

Written estimate before any work begins

Every circuit, outlet and light listed

We pull the electrical permit for you

Inspection before the walls close

Licensed Oregon contractor, CCB #259813

Bonded & insured, 1-year warranty on our work

Oregon CCB #259813

Remodel Electrician Questions

When in a remodel should the electrician come in?
At least twice: rough-in after framing and plumbing, before insulation and drywall, so the wiring is inspected in open walls; then finish after cabinets, counters and tile. Call while you're still planning.
We already have a contractor. Can we hire our own remodel electrician?
Yes. We work from your plan, agree dates with your contractor, and book the inspection ourselves. Our written estimate comes to you directly.
Can you move outlets and switches while the walls are open?
Yes — it's the easiest time. While the studs are bare, outlets, switches, lights and the fan can move almost anywhere. Once drywall is up, every change means cutting and patching.
How long does the electrical part of a remodel take?
It depends on the scope. A new circuit takes about a day, recessed lighting for one room about a day, and new outlets are same-day work. Rough-in and finish are separate visits.
Can the electrical part of our remodel be financed?
Yes. Financing is available — ask when you get your written estimate. We also take credit and debit cards.

Where We Work

Book a Remodel Electrician in Portland

Written estimate before any work begins.