503-984-1097Open until 9 pm · Open Sundays
PWR Pro Electric
A new service mast, meter base and gray conduit on the side of a metal outbuilding, with the overhead wires connected at the top of the mast.

Generator Installation in Gresham, OR

  • Transfer switch or interlock installed
  • Sized to what you want running
  • No pressure to buy extras
1–2 days
Typical standby install
Inlet + interlock
For the portable you own
No back-feed
Onto the PGE line, ever
✓
Financing available

What Our Customers Say

Professional and Informative! Igor installed a E.V. 240V plug outside my home and did a clean and professional install. Compared to other bids I received, Igor's was fair and after he was done it was definitely worth every penny. He pointed out things that I should be aware of and informed me of options to take care of it. He let me know about the importance of surge protector and installed one for me on the fly. I am definitely going to use Pwr Pro Electric for future electrical projects.
Michael C.
EV outlet and surge protector
I had Pwr Pro install an outlet for our generator and charging station for our Tesla. They were super professional, met and exceeded our expectations with the price, quality of work, and timeliness. They are at the top of our list when it comes to electrical repair and service. Thank you!
Guitar Sales & Service
Tesla charging station and generator outlet
What an amazing electrician! Igor installed a new fuse panel for our house with a whole house surge protector. He was extremely thorough and went the extra mile to ensure our wiring was sound and there were no other issues. I recommend Pwr Pro for all your electrical needs, from the smallest of repairs to the biggest jobs they will take care of you!
VinylGraphicsDesign
New panel and whole-house surge protector

What Should Keep Running in Your Gresham Home When the Power Drops?

A standby unit that takes over on its own, or a safe hookup for the portable you already own. Either way, nothing feeds back onto the PGE line.

If you already own a portable generator, the first question is how it reaches the house. An extension cord to the fridge is safe but limited. Back-feeding the house through a dryer outlet with a double-ended cord is not safe at all. The proper hookup has two parts: an inlet on an outside wall, and an interlock plate or manual transfer switch at the panel that lets the generator breaker on only when the main is off. You plug in at the inlet, flip two breakers, and the circuits you picked run from the panel as usual.

A standby generator is the hands-off version: a fixed unit on an outdoor pad, wired through an automatic transfer switch that cuts the house off from PGE's line before the generator takes the load, then reverses the order when the grid comes back. That break is what protects a lineworker on a line that should be dead. A standby generator installation usually takes 1 to 2 days. A licensed gas fitter runs the natural gas or propane line, and we schedule around that so the unit has fuel when we test it with the main breaker off.

How Generator Installation Runs Here

1

List what stays on

Your list sets the size and the switch

2

Written estimate

Standby or portable hookup, agreed before work

3

Check the panel

Space and condition, before the switch lands

4

Set and connect

Unit or inlet mounted, switch wired to the panel

5

Changeover test

Inspection passed, then main off, generator on

More than half of Gresham's homes (53%) date from 1960–89, and their panels were never planned around a generator. The switch or interlock lands at the panel, so a panel with no room, or a Federal Pacific Stab-Lok or Zinsco, comes first.

Signs It Is Time to Call About Backup Power

An outage has already spoiled a freezer of food
Medical equipment at home that needs power
A sump or well pump you cannot lose
A portable in the garage with no safe hookup
Cords run through a window every outage

What Affects the Cost of Generator Installation in Gresham

The first choice, portable hookup or standby unit, sets most of the job, and your list of circuits does the rest.

  • Portable hookup or standby unit

    An inlet and interlock for a portable you own is a small job next to a pad-mounted unit with automatic switching.

  • How many circuits you keep

    Carrying the whole panel calls for a bigger unit and switch than carrying the fridge, furnace and a few lights.

  • Interlock plate or transfer switch

    An interlock fits on the existing panel; a separate manual transfer switch adds a box and more wiring.

  • A panel from 1960–89

    Over half the homes here date from those years, and a full panel, Federal Pacific or Zinsco is dealt with first.

  • Where the unit sits

    The farther the pad or inlet is from the panel, the more cable and conduit the run takes.

  • Fuel to a standby unit

    A standby unit needs natural gas or propane piped by a licensed gas fitter, and we schedule around that work.

  • Keeping PGE's line safe

    The switch has to cut the house off from PGE's line, and the city inspects the electrical side before the changeover test.

Every job gets a written estimate before any work starts.

Why Homeowners Here Call PWR Pro Electric

No back-feed onto PGE

Every hookup goes through a switch or interlock

We pull the electrical permit for you

The gas fitter files theirs; we schedule around both

Bonded & insured

Licensed Oregon contractor, 1-year warranty on our work

Oregon CCB #259813

Questions Homeowners Ask

Can the generator cover only some of my circuits?
Yes. The transfer switch can carry the whole panel or a chosen set of circuits; covering only the essentials keeps the unit smaller.
I already own a portable. Can you hook it up to my panel?
Yes, with an inlet outside and a manual transfer switch or panel interlock. You start the portable and switch over by hand.
Does PGE have to do anything for a generator install?
Not for the generator itself. PGE serves Gresham homes but comes in only when the service changes, so if the job begins with a panel upgrade, PGE disconnects and reconnects the house for that part.
How many days does a standby generator installation need?
Usually 1 to 2 days. A hookup for a portable is a smaller job.

Book Generator Installation in Gresham

Written estimate before any work begins.

Also serving nearby:
PortlandTroutdaleHappy ValleyFairviewWood Village