503-984-1097Open until 9 pm · Open Sundays
PWR Pro Electric
A new service mast, meter base and gray conduit on the side of a metal outbuilding, with the overhead wires connected at the top of the mast.

Generator Installation in Vancouver, WA

  • Transfer switch or interlock installed
  • Sized to what you want running
  • Financing available
PWRPRPE749NP
Washington electrical contractor license
1–2 days
Typical standby install
ATS or interlock
No back-feed onto the utility line
2 trades
Electrical by us, gas by a licensed fitter

What Our Customers Say

Professional and Informative! Igor installed a E.V. 240V plug outside my home and did a clean and professional install. Compared to other bids I received, Igor's was fair and after he was done it was definitely worth every penny. He pointed out things that I should be aware of and informed me of options to take care of it. He let me know about the importance of surge protector and installed one for me on the fly. I am definitely going to use Pwr Pro Electric for future electrical projects.
Michael C.
EV outlet and surge protector
I had Pwr Pro install an outlet for our generator and charging station for our Tesla. They were super professional, met and exceeded our expectations with the price, quality of work, and timeliness. They are at the top of our list when it comes to electrical repair and service. Thank you!
Guitar Sales & Service
Tesla charging station and generator outlet
What an amazing electrician! Igor installed a new fuse panel for our house with a whole house surge protector. He was extremely thorough and went the extra mile to ensure our wiring was sound and there were no other issues. I recommend Pwr Pro for all your electrical needs, from the smallest of repairs to the biggest jobs they will take care of you!
VinylGraphicsDesign
New panel and whole-house surge protector

What Has to Keep Running When Your Vancouver Home Loses Power?

Standby or portable, your home stays off Clark Public Utilities' line in an outage, and nothing feeds back onto it.

Start with the list, not the generator. Which loads must stay on in an outage — furnace or heat pump, fridge and freezer, a sump or well pump, a few lights, medical equipment? That list decides whether a portable you already own will do or a standby unit makes more sense, and whether the switch should carry every circuit in the panel or only the ones on your list. A standby generator installation puts a fixed unit on a pad with an automatic transfer switch, which separates the house from the Clark Public Utilities (CPU) line before the generator takes the load and switches back when the line returns. It usually takes 1 to 2 days, with the natural gas or propane line run by a licensed gas fitter.

For a portable, the safe hookup is an outside inlet feeding the panel through a transfer switch or interlock, so the generator breaker can only be on while the main is off. If the panel or service has to change first, CPU pulls the meter and sets it again only after the inspection passes, which puts part of the schedule on the utility's calendar. Inside Vancouver city limits or out in the county, a different office inspects the work, and we file with the right one.

How Generator Installation Runs Here

1

Choose the circuits

What stays on decides the unit and switch

2

Written estimate

Standby or portable hookup, in writing

3

Pad or inlet

Unit set, or an inlet on an outside wall

4

Switch and panel

Transfer switch or interlock wired in

5

Inspect and test

Sign-off, then a changeover with the main off

Vancouver's housing runs from 13,705 homes built 1970 to 1979 to the 27.0% built in 2000 or later. Age matters at the panel, not the pad: the switch lands in or beside the main panel, so on an older one we check condition and space first.

Signs It Is Time to Look at Backup Power

A winter outage left the house cold
Powered medical equipment is in daily use
The sump pump stops when the power does
A portable sits in the garage, never hooked up
A home office that cannot go dark

What Affects the Cost of Generator Installation in Vancouver

Your list of must-run loads decides the setup, and the setup decides most of the work.

  • Portable or standby

    Hooking up a portable you own takes an inlet and interlock; a standby unit adds a pad, the unit and an automatic switch.

  • Whole panel or chosen circuits

    Carrying every circuit takes a bigger unit and switch than carrying the furnace, fridge and sump pump.

  • Switch type

    An interlock on the existing panel is simpler than a separate manual transfer switch beside it.

  • Distance from the panel

    A pad or inlet far from the panel means a longer run of cable and conduit.

  • Panel condition

    Older panels, like those in the city's 13,705 houses from the 1970s, are checked for space and condition before the switch lands.

  • Gas and CPU

    A licensed gas fitter runs the fuel line, and if the service changes first, a CPU meter visit is added.

  • Inspecting agency

    The city inspects inside its limits and Washington L&I outside them, so your address sets where the work is filed.

Every job gets a written estimate before any work starts.

Why Homeowners Here Call PWR Pro Electric

Licensed in Washington

Electrical contractor PWRPRPE749NP

We pull the electrical permit for you

Filed with the right office for your address

Written estimate before any work begins

Financing available — ask when you get it

WA license PWRPRPE749NP

Questions Homeowners Ask

Do you hold a Washington electrical license?
Yes: Washington electrical contractor license PWRPRPE749NP, alongside Oregon CCB #259813. We are bonded and insured.
Where does Clark Public Utilities come into a generator installation?
At the transfer switch or interlock, which keeps generator power off CPU's line while the grid is down.
Can my portable generator run the furnace through the panel?
It can, if the furnace circuit is one of the circuits you choose and the portable is big enough to carry it. We check that before we wire the inlet and interlock.
From start to finish, how long does a generator installation take here?
Usually 1 to 2 days for a standby unit, plus a CPU meter visit if the service changes.

Book Generator Installation in Vancouver, WA

Written estimate before any work begins.

Also serving nearby:
PortlandCamasWashougalRidgefieldBattle Ground