503-984-1097Open until 9 pm · Open Sundays
PWR Pro Electric
Three new electrical panels installed side by side between the studs, with the wires routed neatly into each one.

Subpanel Installation in Gresham, OR

  • Garage, shop or addition circuits
  • Load checked before we add anything
  • Honest repair-or-replace advice
Load calc
Done before the feeder is sized
Same day
Service available in Gresham
No meter pull
PGE usually not involved
6–10 hours
Typical second-panel job

What Our Customers Say

We had a power emergency and PWR pro electric was able to make time for us that same day. Not only did they fix our outage issue we also had them replace our electrical panel which the city inspector said was one of the best installations he's seen. I highly recommend Igor and will use them for future work.
Cesar C.
Power outage and panel replacement
Igor has been great! We lost power to our house and he was out to assess the situation the next day! Able to replace our panel and get our older house up to code! Truly appreciate his work!
Nicole H.
Panel replacement
Igar was fantastic to work with! Flexible schedule, high quality work, timely and professional ! I couldn’t be happier with the results and would recommend that if you need a reliable electrician he’s your guy! He diagnosed a major issue and full replacement of my panel. High quality happy customer.
Paul P.
Panel replacement

Is Your Gresham Main Panel Out of Breaker Space?

Extra breaker space, fed from your main panel and mounted where the new circuits are needed — garage, shop, ADU or addition.

A subpanel does not bring more power into the house; the service from PGE stays the same size. Its job is to add breaker space. A single large breaker in the main panel sends a feeder cable out to a second panel, and that panel goes where the new load lives — a garage out back, a workshop, an ADU, an addition, a basement being finished. New circuits then start close to the rooms they serve rather than running back across the house, which saves cable and saves opening walls.

Everything starts with a load calculation: what the house uses now plus what the new space will add. If the main panel can carry both, the rest is a feeder breaker in the main, a feeder cable to the new location, the new panel on the wall and its circuits connected. If the incoming service is too small, a panel upgrade comes first, and PGE disconnects and reconnects for that part. Otherwise PGE stays out of it; the main breaker is off only while the feeder is connected. Neutral and ground conductors are kept apart in the new panel, and a detached building gets a grounding electrode of its own. The city inspects the whole installation.

How the Second Panel Goes In

1

Add up loads

The house today, plus the new space

2

Written estimate

Panel location and feeder route agreed first

3

City permit

Bought by us; PGE usually not needed

4

Feeder and panel

Main off, feeder run, new panel mounted

5

Inspect and test

City signs off; every new circuit tested

Most of Gresham's housing, 53% of 44,005 homes, went up between 1960 and 1989. A new shop, ADU or finished basement asks for breaker spaces a panel of that age may not have.

Signs a Second Panel Makes Sense

No open breaker spaces left in the main panel
Tandem breakers already doubled up in the slots
A detached garage, shop or ADU needs power
An addition or finished basement needs circuits
The main panel is far from the new load

What Affects the Cost of a Subpanel in Gresham

A second panel adds breaker spaces, not power, and where it goes decides most of the work.

  • Where the new panel goes

    A basement spot near the main takes a short feeder; a garage out back or an ADU takes a long one.

  • Trenching to an outbuilding

    A detached building is usually fed underground, in conduit laid in a trench.

  • Feeder size

    A space that will run more needs a bigger feeder breaker and heavier cable from the main panel.

  • Grounding at the far building

    A detached shop, garage or ADU needs a grounding electrode of its own, with neutral and ground kept apart.

  • Room in the service

    When the load math says the service cannot carry the new space, the panel is upgraded first, with PGE disconnecting for it.

  • A main panel from 1960–89

    Most local houses date from those years, and a Federal Pacific or Zinsco main points to a replacement instead.

Every job gets a written estimate before any work starts.

Why Homeowners Here Call PWR Pro Electric

Feeder sized to the load calculation

Not to a guess about what the new space will run

No meter pull in most cases

PGE stays out unless the service has to grow

Written estimate before any work begins

Panel location and feeder route in writing

Oregon CCB #259813

Questions Homeowners Ask

Will PGE need to pull the meter for a subpanel?
Usually not. The feeder connects inside the main panel you already have, so only the main breaker goes off while we make that connection. PGE is only involved when the service itself changes.
What electrical work does a basement ADU need?
Usually a subpanel for the unit, its own kitchen, bath and laundry circuits, and interconnected smoke and CO alarms. First we add up your house and the ADU together; if the service is too small, a panel upgrade comes first. It all goes in a written estimate.
When is a subpanel the wrong answer?
When the service is too small for the loads, or the main panel is a Federal Pacific Stab-Lok or Zinsco. Both call for a panel upgrade instead, because a second panel adds spaces, not capacity.
How long does a subpanel installation take?
Typically 6–10 hours, depending on how far the feeder runs and how many circuits move over. The main breaker is off only while the feeder is connected, so the house keeps power for most of the day.

Book a Subpanel Installation in Gresham

Written estimate before any work begins.

Also serving nearby:
PortlandTroutdaleHappy ValleyFairviewWood Village