503-984-1097Open until 9 pm · Open Sundays
PWR Pro Electric
Three new electrical panels installed side by side between the studs, with the wires routed neatly into each one.

Subpanel Installation in Vancouver, WA

  • Garage, shop or addition circuits
  • Load checked before we add anything
  • Work inspected by the city
Space
Adds breaker room, not service size
✓
Permit included
Main off
CPU meter usually stays in
6–10 hrs
Typical install, start to finish

What Our Customers Say

We had a power emergency and PWR pro electric was able to make time for us that same day. Not only did they fix our outage issue we also had them replace our electrical panel which the city inspector said was one of the best installations he's seen. I highly recommend Igor and will use them for future work.
Cesar C.
Power outage and panel replacement
Igor has been great! We lost power to our house and he was out to assess the situation the next day! Able to replace our panel and get our older house up to code! Truly appreciate his work!
Nicole H.
Panel replacement
Igar was fantastic to work with! Flexible schedule, high quality work, timely and professional ! I couldn’t be happier with the results and would recommend that if you need a reliable electrician he’s your guy! He diagnosed a major issue and full replacement of my panel. High quality happy customer.
Paul P.
Panel replacement

Is Your Vancouver Main Panel Full but Still Big Enough?

A second breaker panel for your Vancouver home, fed from your main one and mounted where the new circuits are — usually with no meter pull.

The main panel in your house is sound and the service is big enough, but there is nowhere left to put a breaker — or the new circuits are a long way from it. That is the case for a subpanel. One large breaker in the main panel feeds it through a feeder cable, and it puts breaker space where the work is: a detached shop, a garage, an ADU, a finished basement. It does not add capacity, so we start with a load calculation and tell you plainly if the service itself is too small; then the job becomes a panel upgrade instead. Because the feeder lands inside your existing panel, the work is usually done with the main breaker off and the Clark Public Utilities meter left where it is. In the new panel, neutrals and grounds sit on separate bars. We land the circuits, label each one, and meet the inspector.

How a Subpanel Goes In Here

1

Add up loads

What the house runs, plus the new space

2

Pick the spot

Near the loads, with clear space in front

3

Written estimate

Feeder size and panel location agreed first

4

Feeder and panel

Breaker set, feeder run, new panel mounted

5

Inspect and label

Inspector signs off; every circuit named

Nearly half of Vancouver's homes date from 1990 or later — 21% from the 1990s, 27.0% from 2000 on. A newer panel may have the capacity for a shop or ADU and simply lack the slots, which is the case a second panel solves. The load calculation tells us whether yours is that case.

Signs a Subpanel Is the Right Fix

Every slot in the main panel is spoken for
The shop out back runs on an extension cord
An ADU or addition is on the drawings
New circuits would have to cross the house
A sound panel you would rather keep than replace

What Affects the Cost of a Subpanel in Vancouver

A second panel adds breaker space, not capacity, and its location and load decide most of the work.

  • Distance from the main

    A spot beside the main needs little feeder; a shop out back or a detached ADU needs a long one.

  • Underground feeder

    Reaching a detached building usually means a trench and conduit for the feeder.

  • Feeder size

    What the new space will run sets the size of the feeder breaker and cable.

  • Circuits landed

    Each circuit in the new panel gets its own breaker, cable and label.

  • A separate ground

    A detached shop, garage or ADU gets grounding of its own, with neutrals and grounds on separate bars.

  • Newer panels, few slots

    Nearly half the homes here date from 1990 on, and their panels may have capacity but no free slots.

  • CPU and inspection

    The CPU meter usually stays in, and the city or Washington L&I, depending on the address, inspects the finished work.

Every job gets a written estimate before any work starts.

Why Homeowners Here Call PWR Pro Electric

Load calculation decides the fix

Second panel or bigger service — you see why in writing

We pull the electrical permit for you

Paperwork handled as part of the job

Written estimate before any work begins

Feeder, panel and circuits listed line by line

WA L&I PWRPRPE749NP · Oregon CCB #259813

Questions Homeowners Ask

Will a subpanel give the house more power?
No. It gives you more breaker space, placed where you need it; the power still arrives through the same service. If the load calculation shows the service cannot carry what you are adding, we say so, and the answer is a panel upgrade.
Does a panel in a detached shop need its own ground?
Yes. A detached building gets its own grounding at that building, and inside the panel the neutrals and grounds stay on separate bars. The inspector looks at both.
Where can the new panel be mounted?
Near the loads it feeds — garage, shop, basement or ADU — with the clear working space in front of it that code requires. Bathrooms and clothes closets are ruled out. We pick the spot with you before the estimate is written.
How long does it take to install a subpanel?
Plan on 6–10 hours of work. The meter usually stays in, and the power is off only while the feeder is landed in your main panel.

Book a Subpanel Installation in Vancouver, WA

Written estimate before any work begins.

Also serving nearby:
PortlandCamasWashougalRidgefieldBattle Ground